Consultation has concluded
Elk Run Boulevard and Glacier Drive were initially constructed in the 1980's and 1990's, with only minor lifecycle maintenance completed since. The corridor requires replacement of some deep utilities as well as surface lifecycle pavement rehabilitation work.
When undertaking work like this there is also an opportunity to also improve safety and accessibility throughout the corridor by bringing these roadways into alignment with the Integrated Transportation Plan (ITP).
We are undertaking initial design work for this corridor and are looking for public feedback in two phases:
1. Phase One (Closed) - We are looking to understand your travel experiences on both Elk Run Boulevard and Glacier Drive. To view a copy of what we heard during this phase of engagement, visit the documents section on the right of your screen.
2. Phase Two (late 2023 or early 2024) - The timeline for the project has been delayed, as a result the second phase of feedback will take place in late 2023 or early 2024. Initial design concepts will be presented, based on ITP standards and feedback received in phase one. We will be seeking area and design specific feedback.
Elk Run Boulevard and Glacier Drive were initially constructed in the 1980's and 1990's, with only minor lifecycle maintenance completed since. The corridor requires replacement of some deep utilities as well as surface lifecycle pavement rehabilitation work.
When undertaking work like this there is also an opportunity to also improve safety and accessibility throughout the corridor by bringing these roadways into alignment with the Integrated Transportation Plan (ITP).
We are undertaking initial design work for this corridor and are looking for public feedback in two phases:
1. Phase One (Closed) - We are looking to understand your travel experiences on both Elk Run Boulevard and Glacier Drive. To view a copy of what we heard during this phase of engagement, visit the documents section on the right of your screen.
2. Phase Two (late 2023 or early 2024) - The timeline for the project has been delayed, as a result the second phase of feedback will take place in late 2023 or early 2024. Initial design concepts will be presented, based on ITP standards and feedback received in phase one. We will be seeking area and design specific feedback.
Signup Banner
Timelines
Phase One Feedback Open
Elk Run Blvd/Glacier Drive Rehabilitation has finished this stage
Phase one of consultation is open until noon on June 3.
Phase One Feedback Closed
Elk Run Blvd/Glacier Drive Rehabilitation is currently at this stage
Phase one of feedback is now closed. A report detailing What we Heard will be available shortly.
Phase Two Feedback Open
this is an upcoming stage for Elk Run Blvd/Glacier Drive Rehabilitation
Phase two of consultation has been delayed until late 2023 or early 2024.
Phase Two Feedback Closed
this is an upcoming stage for Elk Run Blvd/Glacier Drive Rehabilitation